Guides & news ·

Buying a home in Concepción: the 8 km coastal defence and its strip

Riverside promenade with a white railing, purple jacaranda trees and a wide river

The Ministry of Public Works is building an 8 km flood defence along the river in Concepción, with four pumping stations and a riverside avenue: an investment of PYG 88,809,640,992. Its social team is checking with the registries which properties fall in the affected strip; residents can ask questions on 16 November.

By · Updated

Share
  • LinkedIn
  • WhatsApp
  • Telegram
  • Facebook
  • X

Concepción, the capital of the northern department of the same name, is getting a flood defence on the Paraguay river. The project, officially the Ampliación de la Defensa Costera, drenaje, avenida Costanera y parque lineal de Concepción – Primera Etapa, is run by the Ministerio de Obras Públicas y Comunicaciones (MOPC). On 4 November 2026 the ministry reported that works continue and that the properties in the strip affected by the route are being checked. Here is what the project includes, in the figures published by the MOPC, and what to verify before buying near the river.

1. What is being built

  • Route: eight kilometres, starting at km 2.2, south of the shipyard (Astillero), according to the MOPC note of 4 August.
  • Defence: a defensive wall with coastal containment systems against the floods of the Paraguay river.
  • Drainage: two pumping stations rehabilitated and two new ones, each with its retention pond, to collect, store and discharge rainwater.
  • Urban works: two kilometres of riverside avenue (costanera) and a linear park on the line of the wall (note of 2 September).
  • Investment: PYG 88,809,640,992, funded entirely with local resources. The works are awarded to LT S.A., under MOPC supervision.

2. Where the works are now

  • North sector: hydraulic fill (refulado) between km 4.7 and km 6.48, with geotechnical instruments installed, according to the note of 2 September; on 2 October the fill was at chainage 4800.
  • South sector: a new front at km 2.2 was being prepared in October.
  • October: fill and complementary works in the north and south sectors, plus drainage and electrification (note of 4 November).
  • End date: none of the four notes gives one.

3. The affected strip

The MOPC writes that the social team is working with the cadastre (Catastro), the municipality, the departmental government and the public registries (Registros Públicos) to verify the situation of the properties in the strip affected by the works (franja de afectación). The notes do not publish a map or a list of the properties concerned.

4. The public meeting on 16 November

The ministry is preparing an information session on Monday 16 November 2026 at 18:00, at the Teatro Municipal of Concepción, where residents, organisations and institutions can learn the details of the project, ask questions and raise concerns.

What it means if you are buying

  • Ask whether the property is in the strip. The check is under way with the cadastre and the registries: the 16 November meeting is the place to ask for the route in front of a specific lot.
  • Read the title certificate. Any restriction registered on the property appears in the registry certificate the notary must obtain before the deed.
  • Drainage changes the street, not only the riverbank. The pumping stations and retention ponds serve the city's rainwater: ask whether the street flooded before and which basin it drains to.
  • Building site with no end date. Fill works, noise and heavy machinery are part of the short term near the route.

The certificates checked before a deed are explained in the guide on certificates before a property deed. The full purchase process is in the Primeproperties.com buying guide, and the Real estate service of Partners.com S.A. follows the checks on a property before the deed.

Sources

Ask the team

A few lines are enough. The team of Partners.com S.A. in Asunción reads every request and replies in your language.

We send a confirmation link to this address: your request reaches the team only after you confirm it.

Phone (optional)

Country code: type the number (with or without +) or the country name, then pick it from the list.

Digits only, without the country code.

At least 20 words: what you are looking for, budget range if relevant, and your timeline. No links, please.

Your request goes to Partners.com S.A., the company that provides the services of Prime Properties.

All guides and news