Under Paraguay's Civil Code, a builder is liable if a building collapses or threatens to collapse within ten years of handover because of faulty construction, soil or materials, and no contract can waive it. Changes to the project are capped at one sixth of the price.
By Emilio Marruso · Updated
Whoever has a house built in Paraguay signs a building contract (contrato de obra), governed by Articles 852 to 865 of the Civil Code, Law No. 1183, promulgated on 23 December 1985. The same Code, in Articles 1789 to 1799, sets the rules on hidden defects that apply once the house is handed over. These are the seven rules an owner should know before signing.
1. Build what was agreed
The builder must carry out the work as agreed, following specifications and plans if there are any, and cannot change the project without the owner's written permission (Art. 855). If unforeseen changes become necessary, the builder must say so at once, stating the effect on the fixed price; the judge decides the changes and the price adjustment. If they exceed one sixth of the agreed price, the builder can withdraw from the contract.
2. Your changes: up to one sixth of the price
The owner can introduce changes to the project up to one sixth of the total agreed price, and the builder is entitled to payment for the extra work even if the price was set as a lump sum (Art. 858). The limit does not apply when the changes alter the nature of the work in a significant way.
3. Deadline, risk and payment
The builder delivers within the agreed term, or the one reasonably needed, and bears the risk of the work until then (Art. 856). Without an agreed date, the price is paid on delivery (Art. 857). For work done in stages, each party can ask for each stage to be checked; paying a stage implies accepting it, while advances on account do not (Art. 859).
4. Ten years for ruin
For buildings and long-lasting works on real estate, the builder is liable for total or partial ruin, or evident danger of ruin, caused by construction defects, soil defects or poor materials, whoever supplied them. The ruin must occur within ten years of the handover. This liability cannot be waived by contract and also extends, depending on the circumstances, to the works director and the designer (Art. 860).
5. Withdrawing from the contract
The owner can withdraw even after work has started, paying the builder's costs, work and the profit the contract would have produced; judges can reduce the profit share if strict application would be clearly unjust (Art. 862).
6. When the builder supplies everything
If the builder supplies all the materials, ownership passes when the finished work is received, and from delivery the rules of sale apply (Art. 853).
7. Hidden defects after delivery
Hidden defects that existed at the transfer and make the property unfit, to the point that the buyer would not have bought or would have paid less, give rise to liability (Art. 1789). There is none for minor defects, visible defects, defects the buyer knew or should have known, or purchases at auction (Art. 1790). The buyer must prove the defect existed at the transfer (Art. 1791). In a sale, the buyer can choose between cancelling the contract and a price reduction, but not both one after the other; a seller who should have known the defects through their trade and kept quiet also owes damages (Art. 1795). Parties can limit this liability, but not where the seller acted in bad faith or knew of defects and did not declare them (Art. 1792).
What it means if you are building
- Attach plans and specifications. They are the yardstick of Article 855.
- Put every change in writing. Beyond one sixth of the price the rules change.
- Keep the handover date. The ten years of Article 860 run from receipt of the work.
- Inspect before receiving. Visible defects are not covered once accepted.